Specification: 93 x 600dia bored timber in concrete piles ranging from 4.2m to 13m in length.
Brief; With space limited in the school our challenge was to build out over the bank. The site platform contained difficult slopes and drilling conditions all overcome with a range of drilling gear and processes. King Drilling Company received a New Zealand Contractors Federation construction award for its work on the project.