Specification: 709 x 10m – 12m x 175-225mm Driven timber piles.
Brief; To supply and install driven timber piles for a new factory floor in Morrinsville.
Piles predrilled to 2m driven to engineers set using two truck mounted drop hammers.
Specification: 709 x 10m – 12m x 175-225mm Driven timber piles.
Brief; To supply and install driven timber piles for a new factory floor in Morrinsville.
Piles predrilled to 2m driven to engineers set using two truck mounted drop hammers.
Specification: Driven steel concrete piles 12 x1200dia x 9m, 8 x 900 dia x 9m, 7 x 600dia x 9m
Brief; Our scope included the driving of steel casions, drilling out of the cases, supply and installation of reinforcing and concrete, clearing and removal of all drilling spoil. All works completed in house
Specification: Excavation, drilled and concrete timber piles
Brief; A residential property on the banks of the Waikato river requiring piling for foundations. Excessive filling on the site required stripping of the site and refilling removing obstructions that would prevent the installation of piles. All work was completed in house giving the job continuous process with knowledge of requirements.
Specification: Supply 120m3 25mpa concrete, Great Barrier Island
Brief: The Requirement was to supply concrete capable of being pumped over 300m from a barge platform at Great Barrier Island. Using 1 x R12 we supplied the concrete to Ian Howe Concrete Plumps who using their HB80 Condor pump pumped from sea level to road level.