Specification: Excavation, drilled and concrete timber piles
Brief; A residential property on the banks of the Waikato river requiring piling for foundations. Excessive filling on the site required stripping of the site and refilling removing obstructions that would prevent the installation of piles. All work was completed in house giving the job continuous process with knowledge of requirements.